What Is Construction Stage?

What is the purpose of a construction phase plan?

A Construction Phase Plan is a key document that details the health and safety risks associated with the construction phase of the project and the control measures that will be implemented to minimise risks or where possible, eliminate them..

Who is responsible for construction phase plan?

Under the Construction (Design and Management) Regulations 2007 (CDM 2007) it is the responsibility of the principal contractor, once they have been appointed, to develop the construction phase plan, which must be completed before the client can allow work on site to proceed.

What are the stages of a construction project?

A construction project entails 5 important stages: initiation, planning, implementation, performance and monitoring, and closing.

What are the three phases of construction?

The three phases followed are the Design Phase, Construction Phase, and Post-Construction Phase. Design Phase – A projects begins with figuring out the scale of work, which determines project cost and provides enough information to give a beginning estimate.

What is a project phase?

The phases of a project are initiation, planning, execution, and closeout.

What are the principles of construction?

High-level Compliance with New Construction Method The Five Construction Principles have been established so that the five elements: environmental protection, safety, speed, economy, and aesthetics, conform with a balanced regular pentagon.

What are the steps to manage a construction project?

Develop a Project Road-map. … Defining Roles and Responsibilities. … The Total Stakeholder Meeting. … Setting Scope and Baselines. … Scheduling. … Developing the Modification Process. … Developing and Implementing the Quality Plan. … Developing a Communication Plan.More items…•

What are the steps in the construction process?

A Step-by-Step Guide to the Home Building ProcessPrepare Construction Site and Pour Foundation.Complete Rough Framing.Complete Rough Plumbing, Electrical HVAC.Install Insulation.Complete Drywall and Interior Fixtures, Start Exterior Finishes.Finish Interior Trim, Install Exterior Walkways and Driveway.More items…

What are the 5 main parts of CDM?

The guidance content is as follows:Introduction.Part 1 – Commencement, interpretation and application.Part 2 – Client duties.Part 3 – Health & Safety Duties and Roles.Part 4 – General requirements for all construction sites.Part 5 – General.Schedule 1 Particulars to be notified under regulation 6.More items…

How long do construction projects take?

Those surveyed at HomeAdvisor state that 3-4 months is about average for this project. But remember, this is only 3 months of construction. The planning, design, and permitting stages can make this project twice as long, even if the construction only takes a few months.

What is construction phase?

Construction Phase This is the execution phase where all the planning will pay off. As the hub of communications for the project, your construction manager and contractor will transition the project into actual construction. The professional team’s role during this phase is called Construction Administration (CA).

How do construction projects work?

A construction project manager is responsible for planning, coordinating, budgeting and supervising projects from the beginning to the end. In short, a construction project manager has to take care of the following: Put together the budget and negotiate cost estimates. Arrange the work timetables.

What does a construction phase plan look like?

The construction phase plan is a health and safety management document for the project. It will include details of the work that is being done, the project team and emergency arrangements.

What is construction documentation?

They describe the work, rights, duties, and responsibilities of all parties. This phase usually follows the Design Development Phase. COMPONENTS. The Construction Documents contain contract forms, conditions of the contract, specifications, and drawings. Bidding requirements are also produced during this phase.